This 1949 picture shows GN Steam Locomotive, #748 resting on the mainline in Palisades on the down grade. This locomotive was a G-3 Class 4-8-0 (twelve wheeler). The locomotive is pulling two coal tenders and a mixed train. The structure in the middle of the picture is the water tower, the building on the right is one of two cold storage warehouses used to store fruit, and the track on the right is the siding. This particular locomotive was scrapped in 1953. Thanks to Bob Kelly for providing the photo.
Built by the Great Northern Railway in 1909, the 61 mile line branched off the mainline at the Columbia River and snaked its way up across Douglas County, WA to its terminus in Mansfield. In 1985 it was abandoned, thus closing the book on railroading on the Waterville Plateau. This blog is dedicated to preserving the history of the Mansfield Branch Line and Waterville Railway Co., as well as showcasing my scratch built HO scale models.
Friday, September 2, 2011
Tuesday, August 23, 2011
Monday, August 1, 2011
Riding the old ROW
The first part of this video shows me riding on the old road bed between Bridge #10 (near McCue) and #9 (near the old tunnel) on the down grade. Make sure you set the video to HD.
Thursday, July 21, 2011
Douglas in 1984
This picture taken by Alan Loebsack in the late winter/early spring of 1984. These BN locomotives are pulling the unit grain train through the Douglas Siding and on pass the depot which was retired 9 years prior in 1975. To the right of the train are piles of grain doors used to seal up the box cars before being filled with grain. About one year later, the depot would host the site of the "last train" (additional photos) ceremonies on March 2, 1985. Here is a picture of the same train crossing Highway 2 in Douglas. Aerial photos of Douglas Siding over the years. Here is map of where Douglas was located on the Mansfield Line.
Here are some more photos (1) (2) (3) (4) showing BN era action in Douglas
Here are some more photos (1) (2) (3) (4) showing BN era action in Douglas
Tuesday, July 12, 2011
Bridge #25 then and now
Pictured above is bridge trestle #25 on the Mansfield Branch. This picture was taken in the spring of '49 after the repairs to it were completed. This bridge, along with many others, were severly damaged in the June '48 flood and was closed 9 months for repairs. The frame bents are still resting in place today. This bridge was orginally constructed 137.5' long and consisted of 9 trestle bents and 2 mud sills. It was also built on a curve. . 2006 photo of bridge 1949 aerial of bridge Photo provided by the Skykomish Historical Society.
November 2007 of the same view as above
Friday, June 24, 2011
Change of alignment
This is a small section along the MB Line that had an alignment shift. Most likely because of the major flood of '48. See the pervious post for pictures of this area.Tuesday, May 31, 2011
Kelly Davis Crossing 5-27-11
Checked out the line between the Kelly Davis Crossing and Bridge #36 (this location about 1 mile south of Alstown, WA). Found and old alignment on the other side of the creek with ties still laying in place. Probably abandoned after the '48 flood, my guess. Nice and wet on the Waterville Plateau with beautiful looking wheat. Happy for the farmers!
Cut looking on the down grade just south of Bridge #35
Old tie and plate still in the ground on the old alignment (see map for location)
Old ties on the old alignment
Looking across Bridge #36 on the down grade
Rock cut at south end of bridge #36 on the down grade
Rock cut at the south end of Bridge #36 on the up grade
Kelly Davis County Road Crossing. Mansfield Branch Line Bridge #33 was just to the right of that crossing. Pilings still visible.
Grade between Bridge #36 and Bridge #35. Looking on the down grade.Tuesday, April 19, 2011
Bridge #17
Bridge #17 on the Mansfield Branch that was washed out in June of '48. The view of this photo is looking up stream. About a mile up stream is where Duffy Creek enters Douglas Creek. Photo provided by Skykomish Historical Society.
Friday, March 18, 2011
Fun times...
My brother (left) and I standing next to a hopper car that derailed a little south of Alstown on the MB line. This was one of 3 cars that broke loose from Douglas. On this day my dad, mom, brother and I rode snowmobiles from Alstown all the way down to the Tunnel on the tracks. I remember crossing over the bridges and riding through the tunnel. We never touched snow the whole way. Fun memories! 1985 photo.Check out the wreck photos here
Wednesday, February 23, 2011
Monday, January 31, 2011
The Wenatchee Daily World: May 17, 1952
Bucking the snow
Waterville Railway Co. Locomotive 4-6-0 #299 plowing its way through the heavy snow near a cattle guard crossing. The photographer was Chester Lockwood, a local man. C. 1914. Photo provided by Harold Badten.
Saturday, January 22, 2011
Monday, January 10, 2011
Friday, December 24, 2010
Tuesday, November 30, 2010
Monday, November 8, 2010
1948 photo of Bridge #9
Wednesday, October 27, 2010
Thursday, October 21, 2010
Tuesday, October 12, 2010
This ain't good
Here is another view of the coach car that wrecked at Douglas in 1920. Photo provided to me by Harold Badten. From an older post
Wednesday, September 29, 2010
Wrecked locomotive
Flooding in 1923 caused the subgrade under the track to washout. This locomotive was heavily damaged when it rolled into Douglas Creek. This accident happened about 1.4 miles south of Douglas.
Wednesday, September 15, 2010
ROW and Track Plans
These blueprints below are from Great Northern Railway’s Engineer/Right-of-way Drawings. These were the original drawings submitted by GNRY to Douglas County and Certified by the State of Washington for start of construction. The following sample prints show all the locations of the bridge trestles within these documents. The date on these documents is 1908, but ROW acquisition began as early as 1906. These Documents have been residing in the courthouse vault for the last 100 years.
Bridge 8: 4 trestle bents and 2 mud sills
Bridge 42: 8 pile bents (1) 16’ opening for wagon road
Bridge 41: 4 pile bents, 8 trestles on piles, 3 cripple trestles and (1) 12’ opening for wagon road
Bridge 40: 10 pile bents
Bridge 39: Pile bulkheads
Bridge 38: 4 pile bents
Bridge 37: 9 pile bents
Bridge 34: 9 pile bents/ Bridge 35: 10 pile bents/ Bridge 36: 10 pile bents
Bridge 31: 8 trestle bents/ Bridge 32: 10 trestle bents/ Bridge 33: 10 trestle bents
Bridge 29: 9 trestle bents/ Bridge 30: 9 trestle bents
Bridge 28: 9 trestle bents/ Bridge 29: 9 trestle bents
Bridge 25: 9 trestle bents and 2 mud sills/ Bridge 26: 17 trestle bents and 2 mud sills
Bridge 22: 10 pile bents/ Bridge 23: 9 pile bents/ Bridge 24: 10 pile bents
Bridge 18: 10 pile bents/ Bridge 19: 6 frame bents and 6 pile bents
Bridge 20: 6 trestles on piles and 6 pile bents/ Bridge 21: 9 pile bents/ Bridge 22: 10 pile bents
Bridge 8: 4 trestle bents and 2 mud sills
Bridge 42: 8 pile bents (1) 16’ opening for wagon road
Bridge 41: 4 pile bents, 8 trestles on piles, 3 cripple trestles and (1) 12’ opening for wagon road
Bridge 40: 10 pile bents
Bridge 39: Pile bulkheads
Bridge 38: 4 pile bents
Bridge 37: 9 pile bents
Bridge 34: 9 pile bents/ Bridge 35: 10 pile bents/ Bridge 36: 10 pile bents
Bridge 31: 8 trestle bents/ Bridge 32: 10 trestle bents/ Bridge 33: 10 trestle bents
Bridge 29: 9 trestle bents/ Bridge 30: 9 trestle bents
Bridge 28: 9 trestle bents/ Bridge 29: 9 trestle bents
Bridge 25: 9 trestle bents and 2 mud sills/ Bridge 26: 17 trestle bents and 2 mud sills
Bridge 22: 10 pile bents/ Bridge 23: 9 pile bents/ Bridge 24: 10 pile bents
Bridge 18: 10 pile bents/ Bridge 19: 6 frame bents and 6 pile bentsBridge 20: 6 trestles on piles and 6 pile bents/ Bridge 21: 9 pile bents/ Bridge 22: 10 pile bents
Subscribe to:
Posts (Atom)


































