Looks like Touhey had a car body depot for some time. I assume this is where the post office was.
Built by the Great Northern Railway in 1909, the 61 mile line branched off the mainline at the Columbia River and snaked its way up across Douglas County, WA to its terminus in Mansfield. In 1985 it was abandoned, thus closing the book on railroading on the Waterville Plateau. This blog is dedicated to preserving the history of the Mansfield Branch Line and Waterville Railway Co., as well as showcasing my scratch built HO scale models.
Wednesday, January 27, 2016
Tuesday, January 5, 2016
Thursday, August 27, 2015
Bridge #29 Damage
Flood damage photos of bridge #29. Date unknown. This bridge was removed after the '48 flood and made much smaller on the other side of the creek when the railroad changed the alignment at this area. Quality of photos is not the best.
Debris pushed up against one of the bents
Looking north
Looking north
Not sure of this location, but it appears soil has washed over the tracks.
Thursday, August 20, 2015
Wednesday, August 19, 2015
Monday, August 17, 2015
Friday, August 14, 2015
Thursday, August 13, 2015
Wednesday, August 12, 2015
Supplee, Wa. in 1984
Train passing through Supplee, Wa. on its return trip back to Wenatchee. March 1984 photo by David Loebsack.
Tuesday, August 11, 2015
Monday, August 10, 2015
Thursday, August 6, 2015
New John Deere Combines
New John Deere 35 pull type combines sit atop flat cars on the Mansfield Branch during the 1940's. From the looks of the terrain, it looks as if the picture was taken south of Douglas.
One Mile South of Douglas
Train in the far distance starting to pass the Buse Ranch one mile south of Douglas. At the bottom right of the photo you can see part of bridge #39.5 at milepost 34.9 The road in the photo is the S. Douglas Rd. which the tracks paralleled for four miles along this section. David Loebsack photo March 1984.
Wednesday, August 5, 2015
Douglas, WA
Alan Loebsack stands on a stack of wooden boxcar grain door liners as the train rounds the curve at Douglas Siding. March 1984 photo by David Loebsack.
Tuesday, August 4, 2015
Monday, August 3, 2015
1984 Derailment
Photos showing the damage caused by a derailed hopper car in the fall of 1984. This scene happened at mile post #24 while the train was moving on the down grade between bridge #17 and #16. One of the mid-train hopper's trucks jumped the tracks and scarred several hundred yards of ties and busted some rail in the process. Photos by David Loebsack.
Aerial photo of derailment location.
Aerial photo of derailment location.
David's cousin Alan standing near mile post marker #24 just up from bridge #17.
Tie damage on the deck of bridge #17 looking on the up grade.
Looking on the down grade across bridge #17 with a BN Caboose #10340 parked in a rock cut.
Damaged track between bridge #17 and #16. Bridge #16 is in the background.
Alan inspects the damage to the rail.
The hopper that caused all the damage. This picture shows the hopper just before bridge #16. The crew caught it before it did damage to Bridge #16.
Friday, July 31, 2015
Bridge #11
1939 Douglas County Plan showing a new road revision under bridge #11 because of a big flood in 1938 that washed it out. This trestle was located between Slack Canyon and Pegg Canyon in Douglas Creek at mile post 21.8 along the line.
Tuesday, June 23, 2015
Wednesday, June 10, 2015
Palisades, WA
People pose for a picture at the Palisades Train Depot. This depot was a 30' x 60' structure built by the Great Northern Railway in 1909, retired and sold in 1937. Photo from the Fran Roth collection.
Tuesday, June 9, 2015
Palisades, WA
Edith Ann Allmendinger (1876-1939), on her way to Wenatchee, waits for the train at the Palisades Depot. She is the grandmother of Fran Roth, a local Palisades resident that still resides there today. Photo taken in 1912 with a caption that reads "Going to town". Photo from the Fran Roth collection.
Railroad Switch Stand
Great Northern Railway Switch Stand painted back to its original luster. Recovered from Supplee, WA in the year 1986 when the Mansfield Branch Line was being removed.
The picture below shows possibly the same switch stand at Supplee in the 1950's.
Monday, June 1, 2015
Railroad Switch Stand
A Great Northern Railway Switch Stand retrieved in 1986 from the northern end of the Supplee Siding when the line was being taken out. It now resides along my golf cart/ATV trail.
Thursday, May 21, 2015
GNRy Culvert Crossing Marker Sign
Great Northern Railway Culvert Marker No. 68. Every culvert was marked with a steel marker sign to identify every crossing. This marker was located somewhere between Douglas and Supplee according to GNRy Track Plans. There were approximately 105 culverts that crossed under the tracks on the Mansfield Branch.