Thursday, March 5, 2015

Duffy Creek to Kelly Davis Crossing

1986 abandonment track plans for the section of track between Duffy Creek (bridge #23) to the Kelly Davis road crossing (bridge #33).


Sheet No. 7 of abandonment set.  Milepost 24.75 to 29.5.





Blow-up at milepost 28 where the alignment was changed in 1948.  Bridge #28 was eliminated and #29 was relocated.  Here is a 1955 aerial showing bridge #29 in its new location.  Click here for more information and pictures about this revision.





Old railroad ROW track plans superimposed over a current aerial photograph.  


No comments: