Monday, March 9, 2015

Alstown to Douglas Abandoned

1986 abandonment track plans for the section of track between bridge #33 and bridge #40.

Sheet No. 8 of abandonment set.  Milepost 29.5 to 35.




Blow-up area of above sheet.




Track and ROW highlighted as being abandoned.  They used a drawing dating back to 1935 as a base drawing.  Most of the structures on the plan were long gone by 1986. 




No comments: