Bridge #17 on the Mansfield Branch that was washed out in June of '48. The view of this photo is looking up stream. About a mile up stream is where Duffy Creek enters Douglas Creek. Photo provided by Skykomish Historical Society.
Built by the Great Northern Railway in 1909, the 61 mile line branched off the mainline at the Columbia River and snaked its way up across Douglas County, WA to its terminus in Mansfield. In 1985 it was abandoned, thus closing the book on railroading on the Waterville Plateau. This blog is dedicated to preserving the history of the Mansfield Branch Line and Waterville Railway Co., as well as showcasing my scratch built HO scale models.
Tuesday, April 19, 2011
Friday, March 18, 2011
Fun times...
My brother (left) and I standing next to a hopper car that derailed a little south of Alstown on the MB line. This was one of 3 cars that broke loose from Douglas. On this day my dad, mom, brother and I rode snowmobiles from Alstown all the way down to the Tunnel on the tracks. I remember crossing over the bridges and riding through the tunnel. We never touched snow the whole way. Fun memories! 1985 photo.Check out the wreck photos here
Wednesday, February 23, 2011
Monday, January 31, 2011
The Wenatchee Daily World: May 17, 1952
Bucking the snow
Waterville Railway Co. Locomotive 4-6-0 #299 plowing its way through the heavy snow near a cattle guard crossing. The photographer was Chester Lockwood, a local man. C. 1914. Photo provided by Harold Badten.
Saturday, January 22, 2011
Monday, January 10, 2011
Friday, December 24, 2010
Tuesday, November 30, 2010
Monday, November 8, 2010
1948 photo of Bridge #9
Wednesday, October 27, 2010
Thursday, October 21, 2010
Tuesday, October 12, 2010
This ain't good
Here is another view of the coach car that wrecked at Douglas in 1920. Photo provided to me by Harold Badten. From an older post
Wednesday, September 29, 2010
Wrecked locomotive
Flooding in 1923 caused the subgrade under the track to washout. This locomotive was heavily damaged when it rolled into Douglas Creek. This accident happened about 1.4 miles south of Douglas.
Wednesday, September 15, 2010
ROW and Track Plans
These blueprints below are from Great Northern Railway’s Engineer/Right-of-way Drawings. These were the original drawings submitted by GNRY to Douglas County and Certified by the State of Washington for start of construction. The following sample prints show all the locations of the bridge trestles within these documents. The date on these documents is 1908, but ROW acquisition began as early as 1906. These Documents have been residing in the courthouse vault for the last 100 years.
Bridge 8: 4 trestle bents and 2 mud sills
Bridge 42: 8 pile bents (1) 16’ opening for wagon road
Bridge 41: 4 pile bents, 8 trestles on piles, 3 cripple trestles and (1) 12’ opening for wagon road
Bridge 40: 10 pile bents
Bridge 39: Pile bulkheads
Bridge 38: 4 pile bents
Bridge 37: 9 pile bents
Bridge 34: 9 pile bents/ Bridge 35: 10 pile bents/ Bridge 36: 10 pile bents
Bridge 31: 8 trestle bents/ Bridge 32: 10 trestle bents/ Bridge 33: 10 trestle bents
Bridge 29: 9 trestle bents/ Bridge 30: 9 trestle bents
Bridge 28: 9 trestle bents/ Bridge 29: 9 trestle bents
Bridge 25: 9 trestle bents and 2 mud sills/ Bridge 26: 17 trestle bents and 2 mud sills
Bridge 22: 10 pile bents/ Bridge 23: 9 pile bents/ Bridge 24: 10 pile bents
Bridge 18: 10 pile bents/ Bridge 19: 6 frame bents and 6 pile bents
Bridge 20: 6 trestles on piles and 6 pile bents/ Bridge 21: 9 pile bents/ Bridge 22: 10 pile bents
Bridge 8: 4 trestle bents and 2 mud sills
Bridge 42: 8 pile bents (1) 16’ opening for wagon road
Bridge 41: 4 pile bents, 8 trestles on piles, 3 cripple trestles and (1) 12’ opening for wagon road
Bridge 40: 10 pile bents
Bridge 39: Pile bulkheads
Bridge 38: 4 pile bents
Bridge 37: 9 pile bents
Bridge 34: 9 pile bents/ Bridge 35: 10 pile bents/ Bridge 36: 10 pile bents
Bridge 31: 8 trestle bents/ Bridge 32: 10 trestle bents/ Bridge 33: 10 trestle bents
Bridge 29: 9 trestle bents/ Bridge 30: 9 trestle bents
Bridge 28: 9 trestle bents/ Bridge 29: 9 trestle bents
Bridge 25: 9 trestle bents and 2 mud sills/ Bridge 26: 17 trestle bents and 2 mud sills
Bridge 22: 10 pile bents/ Bridge 23: 9 pile bents/ Bridge 24: 10 pile bents
Bridge 18: 10 pile bents/ Bridge 19: 6 frame bents and 6 pile bentsBridge 20: 6 trestles on piles and 6 pile bents/ Bridge 21: 9 pile bents/ Bridge 22: 10 pile bents
Tuesday, July 20, 2010
Supplee in the late Winter of 1984
About the only thing Supplee had were grain facilities, a section house, bunk house and some out buildings. These were all removed in about the early 30's, except the grain facilities. Supplee never had a depot. The folowing photos show the train in Supplee on a winter afternoon making its return trip back to Wenatchee. Alan Loebsack photos.