Great Northern Railway AFE’s ( Authorization For Expenditure) on the Mansfield Branch
Info compiled from Great Northern Railway Historical Society Archives


Columbia River
1946 Install steel span bridge #1

Moses Coulee
1901 Put in steel bridge and approach
1918 Install ROW fence
1920 Install ROW fence
1922 Move public crossing
1930 Culvert #1
1938 Remove passing track

Bon Spur
1952 Install Bonneville Power Spur
1957 Grading, ditching, roads and culvert work

Appledale
1947 Replace steel span bridge #2
1949 Repair flood damaged steel span bridge #2
1963 Renew bridge #2
1966 Renew stringers on bridge #2

Palisades
1911 Install 4,975’ of Right of way fence
1915 Remove mail crane
1922 Retire car body depot
1927 Retire fill in bridge #8
1932 Renew timbering on tunnel
1936 Retire Depot
1936 Stream channel and rip-rap bridge #3
1945 Renew timbers in tunnel
1947 Replace bridge #3
1952 Repair tunnel
1964 Fill in bridge #4

McCue
1918 Install mail crane from Rock Island
1928 Remove mail crane
1940 Alter bridge #11
1949 Move camp buildings to Loon Lake, WA
1962 Renew bridge #9
1963 Renew bridge #11, 14, 20, 21, 25
1964 Renew bridge #10, 14, 15, 17, 26, 30
1965 Renew bridge #15-fill 4 spans, #16-fill 1 span
1966 Renew bridge #22

Alstown
1915 Install car body depot
1916 Install portable stock chute
1928 Rip-rap from Alstown to Douglas
1936 Retire section house and bunk house
1950 Remove water tank and pump
1956 Move section buildings
1964 Renew bridge #30
1964 Fill easterly span on bridge #27
1966 Re-drive bridge #30, 31 pilings

Douglas
1912 Transfer track for Waterville Railway Co.
1917 Extend industry track
1919 Install Waterville Railway Co. Engine Wye
1937 Install automobile unloading platform
1938 Repair flood damage-grading, ditching, roads and culverts
1941 Install driveway around depot
1946 Install electrical lights in depot
1947 Install 2-wire telephone circuit-mile post 35 to 37
1949 Extend Cent Mills Spur
1956 Acquire Waterville Railway Co. tracks
1956 Move section buildings
1957 Renew bridge 39
1960 Drill well for depot and section house
1962 Purchase pick-up truck

Supplee
1921 Remove section house and privies, moved to Omak, WA
1957 Grading, ditching, roads and culvert work

Withrow
1915 Move water tank to Glasgow, MT
1916 Remove pump house
1916 Install stockyard
1918 Install section foreman’s cottage
1919 Install private spur track
1929 Section house moved from Withrow to Mohler, WA
1930 Section house moved to Brewster, WA
1928 Remove section buildings
1932 Remove Standard Oil Spur
1936 Retire Depot
1940 Grading, ditching, roads and culvert work
1944 Extend industry track
1957 Renew bridge #41

Touhey
1964 Renew bridge #42


Mansfield
1913 Install portable unloading platform
1916 Install Standard Oil Spur
1917 Install express lockers in depot
1918 Install unloading platform
1920 Lay cinder ballast-Columbia River to Mansfield
1922 Repairs to bridges
1923 Install Columbia Valley Lumber Spur
1931 Remove engine house, coaling platform and 4 tracks
1932 Move tool house from Palisades to Mansfield
1940 Remove industry track
1941 Remove tail end of wye
1942 Remove depot
1942 Remove water tank
1949 Install crossover track between main line and siding
1956 Move section buildings
1957 Retire right of way on Mansfield Branch Extension
1963 Rearrange bents on bridge #43
1964 Rearrange bents and steel span on bridge #43

3 comments:

SDP45 said...

1957 Retire right of way on Mansfield Branch Extension

Any idea how far this went?

Dan

MB Line said...

about 2 miles past mansfield. I came across some old ROW drawings here at work.

SDP45 said...

And you have copies of said ROW drawings now? Is there a date on them?

Dan